View All
22 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.4.3.1.A_Real_Time_Current_Station_Report.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
4.2.1.2_(B1)_Teledyne_RD_Instruments_Workhorse_ADCP_IA_Checklist.pdf
Author:
Keywords/Tags:
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
6.2.1.2.1_Tools_Checklist_HADCP.pdf
Author: John Stepnowski
Keywords/Tags:
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf
Author: Christopher Paternostro;Richard Bourgerie
Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf
Author: Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
Keywords/Tags:
Filename Author Keywords/Tags
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf SonTek COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.4.3.1.A_Real_Time_Current_Station_Report.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
4.2.1.2_(B1)_Teledyne_RD_Instruments_Workhorse_ADCP_IA_Checklist.pdf
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
6.2.1.2.1_Tools_Checklist_HADCP.pdf John Stepnowski
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Christopher Paternostro;Richard Bourgerie CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
Last modified: 2018-11-07 14:59 UTC