View All
9 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf
Author: DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM
Keywords/Tags: COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
7.3.B.1.1_C-MIST_User_Manual.pdf
Author: Paul Fanelli;CECAT
Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf
Author: Caleb Gostnell (POB)
Keywords/Tags: engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
Filename Author Keywords/Tags
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
7.3.B.1.1_C-MIST_User_Manual.pdf Paul Fanelli;CECAT dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf Caleb Gostnell (POB) engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
Last modified: 2018-11-07 14:59 UTC