CO-OPS Field Library manuals, operating procedures, publications and more

View All
7 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
Filename Author Keywords/Tags
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf SonTek COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Kasey Standridge, CIL Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
Last modified: 2018-11-07 14:59 UTC