CO-OPS Field Library manuals, operating procedures, publications and more

View All
26 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf
Author: Aquatrak Corporation
Keywords/Tags: COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf
Author: DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM
Keywords/Tags: COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Current_Station_Report.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf
Author: Eddie Roggenstein
Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf
Author: Paul Fanelli;CECAT
Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
3.3.1.1_Submission_of_Documentation_to_ERB.pdf
Author: Manoj Samant, Bruce L. Servary, Jr.
Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
Filename Author Keywords/Tags
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf Aquatrak Corporation COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf Vaisala Oyj COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Current_Station_Report.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Eddie Roggenstein maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf Paul Fanelli;CECAT dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Manoj Samant, Bruce L. Servary, Jr. template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
Last modified: 2018-11-07 14:59 UTC