View All
3 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
Filename Author Keywords/Tags
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
Last modified: 2018-11-07 14:59 UTC