CO-OPS Field Library manuals, operating procedures, publications and more

View All
7 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf
Author: Manoj Samant
Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf
Author: Brandon Coleman
Keywords/Tags: FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
3.2.3.5.E1_Standing_Project_Instructions_for_CO-OPS_Observing_Systems.pdf
Author: CO-OPS
Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf
Author: Thomas F. Landon
Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.3.C1_User’s_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf
Author: Manoj Samant
Keywords/Tags:
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
Filename Author Keywords/Tags
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Manoj Samant SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Brandon Coleman FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
3.2.3.5.E1_Standing_Project_Instructions_for_CO-OPS_Observing_Systems.pdf CO-OPS SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Thomas F. Landon bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.3.C1_User’s_Guide_to_Vertical_Control_and_Geodetic_Leveling_for_CO-OPS_Observing_Systems.pdf Manoj Samant
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf CO-OPS Engineering Division SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
Last modified: 2018-11-07 14:59 UTC