View All
59 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf
Author: Nortek AS
Keywords/Tags: COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf
Author: Aquatrak Corporation
Keywords/Tags: COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf
Author: DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM
Keywords/Tags: COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.3.1.2.B_Equipment_and_tools_checklist.pdf
Author: Caleb Gostnell
Keywords/Tags: Field Installation Project Lifecycle, FIPL, tool box, electronics, test equipment, PPE, FOD, instrument, enclosure, tide house, gauges, SCUBA, diving, orifice, stilling, MET, bench mark, survey, level, GPS, specialized
5.2.3.5.1_SoftwareChecklist-CECAT.pdf
Author: Christopher Paternostro
Keywords/Tags: ISD, FIPL, Field Installation Project Lifecycle, ISSO, field, installed, currents, survey
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf
Author: Robert Heitsenrether;OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.1.4A_BarometerCalibrationProcedure.pdf
Author: Kathleen Bailey
Keywords/Tags: SOM, Station Operation and Maintenance, barometer, calibration, sutron, maintenance, installation, Xpert
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf
Author: Adam Grodsky, COET
Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C1_Users_Guide_for_Installation_of_Bench_Marks.pdf
Author:
Keywords/Tags:
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf
Author: Winston Hensley, Christopher Haith, Robert Heitsenrether
Keywords/Tags:
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf
Author: Brandon Coleman
Keywords/Tags: FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
5.5.3.1.A_eSite_User's_Guide.pdf
Author: Trevor.Mackessy-Lloyd
Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
4.4.1.1_DPAS_Configured_Test_Station_IDs_for_Pre-Installation_Testing.pdf
Author: CO-OPS
Keywords/Tags: FIPL, Field Installation Project Lifecycle, Communications, Contractors, Data, Data Logger, Data Collection Platform, DCP, Equipment, Geostationary Orbital Environmental Satellites, GOES, Installation, Satellite, Satlink, Station, CIL, Chesapeake Instrument Lab
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf
Author: Bruce Servary, OET
Keywords/Tags: goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf
Author: Richard.Edwing
Keywords/Tags: NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf
Author: Warren Krug
Keywords/Tags: ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
Filename Author Keywords/Tags
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf SonTek COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf Nortek AS COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf Aquatrak Corporation COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf Vaisala Oyj COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.3.1.2.B_Equipment_and_tools_checklist.pdf Caleb Gostnell Field Installation Project Lifecycle, FIPL, tool box, electronics, test equipment, PPE, FOD, instrument, enclosure, tide house, gauges, SCUBA, diving, orifice, stilling, MET, bench mark, survey, level, GPS, specialized
5.2.3.5.1_SoftwareChecklist-CECAT.pdf Christopher Paternostro ISD, FIPL, Field Installation Project Lifecycle, ISSO, field, installed, currents, survey
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf Robert Heitsenrether;OSTEP FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.1.4A_BarometerCalibrationProcedure.pdf Kathleen Bailey SOM, Station Operation and Maintenance, barometer, calibration, sutron, maintenance, installation, Xpert
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Adam Grodsky, COET SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C1_Users_Guide_for_Installation_of_Bench_Marks.pdf
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Winston Hensley, Christopher Haith, Robert Heitsenrether
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Brandon Coleman FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
5.5.3.1.A_eSite_User's_Guide.pdf Trevor.Mackessy-Lloyd eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
4.4.1.1_DPAS_Configured_Test_Station_IDs_for_Pre-Installation_Testing.pdf CO-OPS FIPL, Field Installation Project Lifecycle, Communications, Contractors, Data, Data Logger, Data Collection Platform, DCP, Equipment, Geostationary Orbital Environmental Satellites, GOES, Installation, Satellite, Satlink, Station, CIL, Chesapeake Instrument Lab
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf Bruce Servary, OET goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Christopher Paternostro ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf Richard.Edwing NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf Warren Krug ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
Last modified: 2018-11-07 14:59 UTC