CO-OPS Field Library manuals, operating procedures, publications and more

View All
9 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf
Author: Brandon Coleman
Keywords/Tags: FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
3.2.3.5.E1_Standing_Project_Instructions_for_CO-OPS_Observing_Systems.pdf
Author: CO-OPS
Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf
Author: Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf
Author: Adam Grodsky
Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.3.1.1_Submission_of_Documentation_to_ERB.pdf
Author: Manoj Samant, Bruce L. Servary, Jr.
Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
3.3.1.2_Submission_of_Documentation_to_FERS.pdf
Author: Warren Krug
Keywords/Tags: field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS
Filename Author Keywords/Tags
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf Brandon Coleman FIPL, Field installation project lifecycle,Transmittal Letter,eSite,Sensor Test Worksheet,Sensor Elevation Drawing,Bench Mark Diagram,Bench Mark Descriptions,Station To-Reach Statement,Digital Photographs,Precise Leveling Abstract,Datum Offset Computation Worksheet,GPS,Diving
3.2.3.5.E1_Standing_Project_Instructions_for_CO-OPS_Observing_Systems.pdf CO-OPS SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Minilek Hailegeberel SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Adam Grodsky SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf CO-OPS Engineering Division SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Manoj Samant, Bruce L. Servary, Jr. template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
3.3.1.2_Submission_of_Documentation_to_FERS.pdf Warren Krug field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS
Last modified: 2018-11-07 14:59 UTC