CO-OPS Field Library manuals, operating procedures, publications and more

View All
40 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf
Author: Nortek AS
Keywords/Tags: COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf
Author: Aquatrak Corporation
Keywords/Tags: COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf
Author: DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM
Keywords/Tags: COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.3.2.B_Currents_ToolBag_Checklist.xls
Author: Steven R. Bassett
Keywords/Tags: equipment, tools, ncop, field, deployment, recovery, currents
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Current_Station_Report.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
Filename Author Keywords/Tags
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf SonTek COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf Nortek AS COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf Aquatrak Corporation COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.6_(F1-1)_Waterlog_H3551_User_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2010, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Bubbler, Contractors, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, PORTS, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf Vaisala Oyj COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
5.4.3.2.B_Currents_ToolBag_Checklist.xls Steven R. Bassett equipment, tools, ncop, field, deployment, recovery, currents
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
5.4.3.1.A_Real_Time_Current_Station_Report.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.5_CIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Kasey Standridge, CIL Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
Last modified: 2018-11-07 14:59 UTC