View All
50 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf
Author: SonTek
Keywords/Tags: COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf
Author: Nortek AS
Keywords/Tags: COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf
Author: Aquatrak Corporation
Keywords/Tags: COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf
Author: Design Analysis Associates, Inc. YSI Xylem
Keywords/Tags: COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf
Author: DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM
Keywords/Tags: COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf
Author: R.M. Young Company
Keywords/Tags: COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf
Author: Vaisala Oyj
Keywords/Tags: COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
6.3.2.1.5_MWWL_AI_Checklist.pdf
Author: OSTEP
Keywords/Tags: SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, AI, MWWL
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf
Author: Caleb Gostnell;Lynn Asbeck;Keith Brkich
Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf
Author: Keith Brkich;Caleb Gostnell;Daniel Johnson
Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
6.3.1.1_Submission_IP_or_Phone_Number_Changes.pdf
Author: Kevin Harrison
Keywords/Tags: SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, GOES,transmit, GPS, signal, POTS,excel, e-site,address, serial number, phone, ESN,FOD, AOB, POB
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf
Author: FOD Team Leads
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf
Author: Jason Standridge
Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.10_Exporting_Xpert2_Data_To_USB_Or_SD_Card.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.11_Communicating_With_Xpert2_DataLoggers_Via_Ethernet.pdf
Author: Nathan Holcomb
Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Sutron, Xpert Offline, dcp, ethernet
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf
Author: Adam Grodsky
Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf
Author: Adam.Grodsky@noaa.gov
Keywords/Tags: SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.4.1.1_DPAS_Configured_Test_Station_IDs_for_Pre-Installation_Testing.pdf
Author: CO-OPS
Keywords/Tags: FIPL, Field Installation Project Lifecycle, Communications, Contractors, Data, Data Logger, Data Collection Platform, DCP, Equipment, Geostationary Orbital Environmental Satellites, GOES, Installation, Satellite, Satlink, Station, CIL, Chesapeake Instrument Lab
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf
Author: Bruce Servary, OET
Keywords/Tags: goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.A.4.10_NGS_OPSD_Integration_Program.pdf
Author: Phillip Chamberlain;DT
Keywords/Tags: PGQC, product generation and quality control, heights, survey, modernization, federal base network, cooperative, world geodetic system 1984, wgs 84, orthometric heights, geoid model, geoid99, national spatial data infrastructure , nsdi, ngs, reference system, nsrs, navd88, ellipsoid, static gps, ngs-58, rinex, datums, team, oceanographic products and services division
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf
Author: Warren Krug
Keywords/Tags: telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf
Author: Warren Krug
Keywords/Tags: xterm, log on, recover missing data, engineering bulletin
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf
Author: Warren Krug
Keywords/Tags: SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron
3.2.3.9.I12_EB_08_02_Sutron_Xpert_Software_Upgrade_to_Version_2.8.0.3.pdf
Author: Kevin T. Harrison
Keywords/Tags: Sutron, upgrade, Xpert, Xdark, Xlite, 9210, software, firmware, DCP, data collection platform, version, transfer
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf
Author: Caleb Gostnell. POB
Keywords/Tags: sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf
Author: Caleb Gostnell
Keywords/Tags: engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient
3.2.3.9.I20_EB_10-003_Upgrade_Xpert2_Xpert2_Dark_9210B_to_v3.4.0.6.pdf
Author: Jason Standridge
Keywords/Tags: xpert2, xpert2 dark, data logger, 9210b, sutron, data collection platform, dcp, 10-003, engineering bulletin
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
Filename Author Keywords/Tags
4.3.1.3_(C3)_Acoustic_Doppler_Profiler_Operation_Manual.pdf SonTek COPYRIGHT 2001, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C4)_Sontek_ADP_Principles_of_Operation.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C5)_Acoustic_Doppler_Profiler_Software_Manual.pdf SonTek COPYRIGHT 2000, SONTEK. USED WITH PERMISSION. Acoustic, ADCPX, AI, Annual Inspection, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.3_(C6)_Aquadopp_Current_Profiler_User_Guide.pdf Nortek AS COPYRIGHT 2008, NOTREK AS. USED WITH PERMISSION. Acoustic, AI, Aids to Navigation, Annual Inspection, ATON, Buoy, Contractors, Currents, Data, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Sensor, ESS, Engineering and System Specifications
4.3.1.4_(D1)_Users_Guide_for_4100_4110_Aquatrak.pdf Aquatrak Corporation COPYRIGHT 2006, AQUATRAK CORPORTATION. USED WITH PERMISSION. Acoustic, AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Monitoring, PORTS, SDI-12, Sensor, Station, Tides, Transducer, ESS, Engineering and System Specifications
4.3.1.4_(D3)_Waterlog_H334_Shaft_Angle_Encoder_Manual.pdf Design Analysis Associates, Inc. YSI Xylem COPYRIGHT 2002, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Hydro, Installation, Maintenance, Microwave, PORTS, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D8)_Waterlog_H3611_SDI12_Radar_Water_Level_Sensor_Manual.pdf DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM COPYRIGHT 2008, DESIGN ANALYSIS ASSOCIATES, INC YSI XYLEM. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, DCP, Data Collection Platform, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Hydro, Installation, Maintenance, Microwave, Monitoring, MWWL, PORTS, Sensor, SDI-12, Station, Tides, ESS, Engineering and System Specifications
4.3.1.4_(D10)_RM_Young_Model_05103_Manual.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D11)_RM_Young_Alpine_Model_0510345.pdf R.M. Young Company COPYRIGHT 2001, R.M. YOUNG COMPANY. USED WITH PERMISSION. AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D12)_Vaisala_Ultrasonic_Wind_Sensors_WS425_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2004, VAISALA OYJ. USED WITH PERMISSION, AI, Anemometer, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Ultrasonic, Wind, ESS, Engineering and System Specifications
4.3.1.4_(D13)_Sutron_Accubar_Multiple_Interface_Gauge_Pressure_Sensor_Operations_and_ Maintenance_Manual .pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. AI, Annual Inspection, Barometer, Barometric Pressure, Contractors, Data, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Report, Sensor, SDI-12, Station, ESS, Engineering and System Specifications
4.3.1.4_(D16)_Vaisala_HMP240_Series_Transmitters_Users_Guide.pdf Vaisala Oyj COPYRIGHT 2001, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Great Lakes, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Relative Humidity, Sensor, Station, Temperature, ESS, Engineering and System Specifications
4.3.1.4_(D20)_Vaisala_FS11_User_Guide.pdf Vaisala Oyj COPYRIGHT 2002, VAISALA OYJ. USED WITH PERMISSION. AI, Annual Inspection, Contractors, Data, Data Collection Platform, DCP, Deliverables, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Meteorological, Monitoring, PORTS, Sensor, Station, Visibility, ESS, Engineering and System Specifications
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B2)_Sutron_9210_XLite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2006, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B3)_Satlink_2_Logger_and_Transmitter_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2011, SUTRON CORPORATION. USED WITH PERMISSION. Communications, Contractors, Currents, Data, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B4)_Sutron_Xpert2_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
4.3.1.2_(B5)_Sutron_9210B_Xlite_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2012, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
6.3.2.1.5_MWWL_AI_Checklist.pdf OSTEP SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, AI, MWWL
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Caleb Gostnell;Lynn Asbeck;Keith Brkich 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Keith Brkich;Caleb Gostnell;Daniel Johnson 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
6.3.1.1_Submission_IP_or_Phone_Number_Changes.pdf Kevin Harrison SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, GOES,transmit, GPS, signal, POTS,excel, e-site,address, serial number, phone, ESN,FOD, AOB, POB
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf FOD Team Leads SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Jason Standridge SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf Caleb Gostnell SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.10_Exporting_Xpert2_Data_To_USB_Or_SD_Card.pdf Caleb Gostnell SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.11_Communicating_With_Xpert2_DataLoggers_Via_Ethernet.pdf Nathan Holcomb SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Sutron, Xpert Offline, dcp, ethernet
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Adam Grodsky SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf Adam.Grodsky@noaa.gov SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.4.1.1_DPAS_Configured_Test_Station_IDs_for_Pre-Installation_Testing.pdf CO-OPS FIPL, Field Installation Project Lifecycle, Communications, Contractors, Data, Data Logger, Data Collection Platform, DCP, Equipment, Geostationary Orbital Environmental Satellites, GOES, Installation, Satellite, Satlink, Station, CIL, Chesapeake Instrument Lab
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf Bruce Servary, OET goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.A.4.10_NGS_OPSD_Integration_Program.pdf Phillip Chamberlain;DT PGQC, product generation and quality control, heights, survey, modernization, federal base network, cooperative, world geodetic system 1984, wgs 84, orthometric heights, geoid model, geoid99, national spatial data infrastructure , nsdi, ngs, reference system, nsrs, navd88, ellipsoid, static gps, ngs-58, rinex, datums, team, oceanographic products and services division
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf CO-OPS Engineering Division SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf Warren Krug telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf Warren Krug xterm, log on, recover missing data, engineering bulletin
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf Warren Krug SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron
3.2.3.9.I12_EB_08_02_Sutron_Xpert_Software_Upgrade_to_Version_2.8.0.3.pdf Kevin T. Harrison Sutron, upgrade, Xpert, Xdark, Xlite, 9210, software, firmware, DCP, data collection platform, version, transfer
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf Caleb Gostnell. POB sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf Caleb Gostnell engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient
3.2.3.9.I20_EB_10-003_Upgrade_Xpert2_Xpert2_Dark_9210B_to_v3.4.0.6.pdf Jason Standridge xpert2, xpert2 dark, data logger, 9210b, sutron, data collection platform, dcp, 10-003, engineering bulletin
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf Chesapeake Instrument Lab
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf Chesapeake Instrument Lab
Last modified: 2018-11-07 14:59 UTC