View All
19 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
2.2.7.1_CO-OPS_Environmental_Compliance_Checklist_for_Station_Maintenance.pdf
Author: Rachel Krasna, Steve Bassett
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist
5.3.1.2.B_Equipment_and_tools_checklist.pdf
Author: Caleb Gostnell
Keywords/Tags: Field Installation Project Lifecycle, FIPL, tool box, electronics, test equipment, PPE, FOD, instrument, enclosure, tide house, gauges, SCUBA, diving, orifice, stilling, MET, bench mark, survey, level, GPS, specialized
5.2.3.5.1_SoftwareChecklist-CECAT.pdf
Author: Christopher Paternostro
Keywords/Tags: ISD, FIPL, Field Installation Project Lifecycle, ISSO, field, installed, currents, survey
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.4.3.2.B_Currents_ToolBag_Checklist.xls
Author: Steven R. Bassett
Keywords/Tags: equipment, tools, ncop, field, deployment, recovery, currents
6.3.2.1.5_MWWL_AI_Checklist.pdf
Author: OSTEP
Keywords/Tags: SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, AI, MWWL
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
4.2.1.2_(B1)_Teledyne_RD_Instruments_Workhorse_ADCP_IA_Checklist.pdf
Author:
Keywords/Tags:
6.2.1.2.1_Tools_Checklist_HADCP.pdf
Author: John Stepnowski
Keywords/Tags:
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf
Author: FOD Team Leads
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.2.2_ATON_Inspection_CheckList.pdf
Author: John Stepnowski
Keywords/Tags: ATON, inspection, checklist, maintenance, AI, buoy, current meter, calibration
6.3.2.2.3_BACP_Inspection_CheckList.pdf
Author: John Stepnowski
Keywords/Tags: BACP, inspection, checklist, maintenance, AI, buoy, current meter, calibration, SOM, station operation and maintenance
6.3.2.2.4_HADP_Inspection_CheckList.pdf
Author: John Stepnowski
Keywords/Tags: HADP, inspection, checklist, maintenance, AI, buoy, current meter, calibration
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
Filename Author Keywords/Tags
2.2.7.1_CO-OPS_Environmental_Compliance_Checklist_for_Station_Maintenance.pdf Rachel Krasna, Steve Bassett SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist
5.3.1.2.B_Equipment_and_tools_checklist.pdf Caleb Gostnell Field Installation Project Lifecycle, FIPL, tool box, electronics, test equipment, PPE, FOD, instrument, enclosure, tide house, gauges, SCUBA, diving, orifice, stilling, MET, bench mark, survey, level, GPS, specialized
5.2.3.5.1_SoftwareChecklist-CECAT.pdf Christopher Paternostro ISD, FIPL, Field Installation Project Lifecycle, ISSO, field, installed, currents, survey
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.1.5_Installation_Readiness_Checklist_for_Currents_Real_Time.pdf Kasey Standridge ncop, adcp, platform, planning, overview, current meter, deployment, ports
5.3.1.5_Site_Preparation_&_Checklist_for_Real-Time_Currents.pdf Kasey Standridge, CIL ncop, adcp, platform, planning, overview, current meter, deployment, ports,installation,deployment, FIPL, Field Installation Project Lifecycle, CIL, Chesapeake Instrument Lab
5.4.3.2.B_Currents_ToolBag_Checklist.xls Steven R. Bassett equipment, tools, ncop, field, deployment, recovery, currents
6.3.2.1.5_MWWL_AI_Checklist.pdf OSTEP SOM, Station O&M,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab, AI, MWWL
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
4.2.1.2_(B1)_Teledyne_RD_Instruments_Workhorse_ADCP_IA_Checklist.pdf
6.2.1.2.1_Tools_Checklist_HADCP.pdf John Stepnowski
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf FOD Team Leads SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.2.2_ATON_Inspection_CheckList.pdf John Stepnowski ATON, inspection, checklist, maintenance, AI, buoy, current meter, calibration
6.3.2.2.3_BACP_Inspection_CheckList.pdf John Stepnowski BACP, inspection, checklist, maintenance, AI, buoy, current meter, calibration, SOM, station operation and maintenance
6.3.2.2.4_HADP_Inspection_CheckList.pdf John Stepnowski HADP, inspection, checklist, maintenance, AI, buoy, current meter, calibration
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
Last modified: 2018-11-07 14:59 UTC